DEUTSCH ENGLISH
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
General Contractor, Network Construction

Networks are characterised by careful project development:
analysis, forecasts and project implementation that leads to the goal.

Together with competent partners, LEONHARD WEISS as general contractor offers customer-appropriate solutions with feasibility studies, overall planning and property acquisition negotiations.

This, of course, includes the corresponding contract preparations, obtaining of all necessary approvals, construction and technical execution as well as digital documentation of all performance data for planning, approval and execution.

The comprehensive take-over of these services guarantees the customer the agreed quality and price (GMP) as well as the shortest possible execution times.

Railway networks place especially high and very specific demands on the contractor with regard to work safety, on-time completion and logistics, since implementation almost always takes place while "wheels are rolling" and construction sites are often inaccessible from the street. Work safety must properly consider the peculiarities of accident prevention when working near tracks. The schedule is based on breaks, that is, the time between two trains. This requires a detailed knowledge and safe handling of construction processes as well as knowledge about special procedures.

Logistics here are of essential importance, since almost all material deliveries must be planned out long in advance and arrive precisely at the right minute. This requires the provision of work trains, use of breaks between trains and provision of machines that can drive on tracks to unload and install the delivered materials.

Spectrum of services
Fibre optic cabling as general contractor
Feasibility studies for fibre optic routes
Execution planning
Easement contracts and negotiations with landowners
Implementation documentation with the latest technical measurement devices (GPS)

Electronic switching units for railways as general contractor
Design and execution planning
Execution of the entire railway core (track crossings, cable conduits, signal foundations, signal
bridges, point heaters, MAS 90...) while "wheels are rolling"
Functional creation of electronic switching units for railways including all accompanying services
(safety guards, safety supervisors, construction monitor, work train and work train conductor and
editing of operating instructions)



  List of tools